Traffic for Rowan county

NCDOT Traffic Incidents in Rowan county

NCDOT - Traveler Information Management System (TIMS). Retrieve real time information on events that cause severe and unusual congestion on NCDOT maintained roadways in North Carolina

Beginning on Thursday, August 17th there will be a new temporary traffic configuration at the US 29/NC 152 interchange. The US 29 Connector to I-85 Northbound will close and all traffic will be rerouted to a new access ramp to I-85 at the I-85/NC 152 interchange.
Posted: August 16, 2017, 2:45 pm
Beginning on Thursday, August 17th there will be a new temporary traffic configuration at the US 29/NC 152 interchange. The US 29 Connector to I-85 Northbound will close and all traffic will be rerouted to a new access ramp to I-85 at the I-85/NC 152 interchange.
Posted: August 16, 2017, 2:45 pm
Traffic Shift to the new traffic pattern at Lentz Road and Old Beatty Ford New Alignment
Posted: August 15, 2017, 6:15 pm
Traffic Shift to the new traffic pattern at Lentz Road and Old Beatty Ford New Alignment
Posted: August 15, 2017, 6:15 pm
HEAVY ECLIPSE TRAFFIC EXPECTED AUG 18-21

Heavy traffic is expected Aug. 18-21 on North Carolina interstates as motorists travel to and through the State to reach the path of totality for the solar ecplise.

Expect high traffic volumes on interstates and primary highways. Plan ahead and schedule extra time into all trips.

In addition, watch for pedestrians, turn on headlights, be aware of distracted drivers, and do not view eclipse while driving or wear eclipse glasses when behind the wheel. Park vehicles off the road to view the eclipse, and follow instructions of all posted signs.

Visit www.NC.gov/Eclipse2017 for more information.
Dial 511 for real time traffic updates during daytime hours.
Posted: August 15, 2017, 12:25 pm
Road Closed with Off-Site Detour for Bridge Replacement beginning September 6, 2017.
Road will reopen by June 15, 2018.

 
Posted: August 11, 2017, 2:50 pm
Road Closed with Off-Site Detour for Bridge Replacement beginning September 6, 2017.
Road will reopen by June 15, 2018.

 
Posted: August 11, 2017, 2:50 pm
Road closed to maintain drainage structures under Coley Rd at the intesection with Balfour Quarry Rd.
Posted: August 10, 2017, 1:55 pm
Road closed to maintain drainage structures under Coley Rd at the intesection with Balfour Quarry Rd.
Posted: August 10, 2017, 1:55 pm
Concrete islands being poured to eliminate left turns from Morlan Park Rd onto Jake Alexander Blvd to improve saftey.
Posted: August 4, 2017, 5:46 pm
Website Design by McBryde Web Site Design          
For technical issues e-mail webmaster@mcbryde.com